MHI Vestas was very satisfied with the performance of the vessel and our gangway solution, resulting in a second contract to support the commissioning phase of the Borkum Riffgrund II offshore wind park from Spring 2018.

The Next Generation Gangway is built in partnership with Bosch Rexroth, the drive and control company. The gangway system offers continuous access while in operation, highly increasing the cycle time. The gangway is installed on a height adjustable pedestal, making horizontal landing possible and therefore also cargo transport by trolley.
The system can be equipped with a lifting winch for motion compensated lifting.

At the moment a rental system is being build which will be available in May 2018. For enquiries please contact our office or send an email to info@barge-master.com.

Watch the Next Generation Gangway at work